EXTENSION CORD SIZING
Only use grounded 3-prong extension cords marked for
outdoor use that are rated for the electrical load.
Minimum Gauge, Outdoor Rated
Total
Amperage
Up to 50 FT (15 M)
Up to 10A
12
10
Up to 15A
10
Up to 20A
8
Up to 30A
6
Up to 35A

PARALLEL OPERATION

Fire and electrocution hazard. Never connect or
disconnect the parallel cord leads when a generator is
running.
Correct connection of the left and right cables is
very important when the generators are used with a
transfer switch to supply power to a building. To
avoid serious personal injury or damage to electrical
devices, including the generators, do not try to power an
electrical system in a building without using an approved
transfer switch.
Connecting to a generator that is not compatible can
cause a low voltage output that can damage tools and
appliances powered by the generator.
Parallel operation gives you the ability to link to a compatible
Westinghouse Inverter Generator for combined running
and peak power output.
A Westinghouse
507PC
separately) is required for parallel operation. This cord
can be purchased from an authorized Westinghouse
Generator dealer.
Up to 100 FT (30 M)
1
8
8
1
6
6
6
WARNING
CAUTION
NOTICE
parallel
cord
Note: Compatible Westinghouse generators without
parallel ports can be operated in parallel with the
receptacle-mounted parallel cable, Part# 260041.
DO NOT use ECO MODE during parallel operation if
powering large surge loads such as an air conditioner or
electric pump. Engine rpm may not adjust quickly enough
to provide the voltage requirements of large surge loads,
causing damage to the devices or the generators.
1. On both generators, make sure the
and the ECO MODE switch are in the OFF position.
2. Connect two parallel cable leads to the parallel outlets
on the first generator, then connect the opposite cable
leads to the other generator's parallel outlets.
Note: If powering devices directly from the generators
(not connected to a building's transfer switch), you
do not need to match the left/right cables to the
generator's parallel outlets.
3. Start one of the generators and wait until the OUTPUT
READY LED illuminates.
4. Start the second generator and wait until the OUTPUT
READY LED illuminates before connecting a load.
5. Connect additional loads as described in Power
Management section.
6. Unplug all loads before stopping the generators.

TRANSPORTING

• Allow the generator to cool a minimum of 30 minutes
before transporting.
• Replace all protective covers on the generator control
panel.
• Only use the generator's fixed handle to lift the unit or
attach any load restraints such as ropes or tie-down
straps. DO NOT attempt to lift or secure the generator
by holding onto any of its other components.
• Keep the unit level during transport to minimize the
possibility of fuel leakage or, if possible, drain the fuel
or run the engine until the fuel tank is empty before
transport.
Fire hazard. Do not up-end the generator or place it on
its side. Fuel or oil can leak and damage to the generator
(purchased
may occur.
Westinghouse Outdoor Power Equipment, LLC | 17
OPERATION
NOTICE
engine/fuel knob
CAUTION

Publicidad

Tabla de contenido
loading

Tabla de contenido