Ii - Buoyancy Mechanism - Bombard SUNRIDER 500 Manual Del Propietário

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

BUOYANCY MECHANISM - Major Phases
II -1-MAJOR PHASES IN STARTING THE BUOYANCY MECHANISM
The boat assembly procedure follows an order you must respect. Proceed step by step, referring each
time to the pages indicated for explanations.
INFLATING PROCEDURE
1. Make an inventory of the items that make up your
boat.
2. Inflate the boat to the required operating pressures
II-2-INFLATING SYSTEM
THE INFLATOR
a. adapter
VALVES "EASY PUSH"
To activate the valves
Push
Activate all valves in inflating position
Fix the hose base in the inflator inflating orifice
To inflate your boat properly, the inflator should
be correctly placed on the ground.
The boat inflates rapidly if the inflator is used
smoothly and without haste.
CAUTION
II – BUOYANCY MECHANISM
in inflating position
The membrane is closed, the
knob is up
DO NOT USE A COMPRESSOR OR COMPRESSED AIR CYLINDER
Page 10 of 35
PAGE
SECTION
7 & 8
Inventory
11 & 12
Inflating the boat
13
Pressure
in deflating position
The membrane is open, the
knob is down
a

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Sunrider 550Sunrider 650

Tabla de contenido