Cleaning And Maintenance - Sime AQUA HE 25 ErP BE Instrucciones Para El Instalador

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

steps.shown.in.fig..13.
4.5
DISASSEMBLY
OF EXPANSION VESSEL
.
The. heating. expansion. tank. is. disas-
sembled.in.the.following.manner:
–..Make.sure.that.the.boiler.has.been.
emptied.of.water.
–..Unscrew. the. union. which. connects.
the.expansion.tank.
–..Remove.the.expansion.tank.
Before.filling.up.the.system.make.sure.
that.the.expansion.tank.is.reloaded.at.
the.pressure.of.0.8.÷.1.bar.
4.6
BURNER MAINTENANCE
(fig. 14)
To. dismantle. the. burner. from. the.
boiler.door,.remove.the.screw.(fig..14).
To. access. the. internal. part. of. the.
burner,. remove. the. air. lock. unit. held.
in.place.by.two.screws.to.the.sides.and.
remove.the.right.hand.shell,.which.is.
held. in. place. by. four. screws,. taking.
care. not. to. damage. the. O-ring. seal..
OR.
4.7
CLEANING
AND MAINTENANCE
Preventive. maintenance. and. check-
ing. of. the. efficient. operation. of. the.
equipment.and.safety.devices.must.be.
carried.out.at.the.end.of.each.heating.
season. exclusively. by. the. authorised.
technical.staff.
4.7.1
Cleaning smoke
ducts (fig. 15)
Use.an.adequate.swab.for.cleaning.the.
smoke.ducts.of.the.boiler..
After.cleaning,.position.the.circulators.
in.their.original.position.(fig..15).
4.7.2
Cleaning combustion head
(fig. 16)
The.combustion.head.is.cleaned.in.the.
following.manner.(fig..16):
–. Disconnect. the. high. tension. cables.
from.the.electrodes.
–. Unscrew. the. fixture. screws. of. the.
circulator.support.and.remove.it.
–. Brush.the.propeller.delicately.(tur-
bulence.disc).
–. Carefully. clean. the. photo-resist-
SCREW
VITE
ance. of. eventual. deposits. of. dirt.
deposited.on.its.surface.
–. Clean. the. remaining. components.
of.the.combustion.head.of.eventual.
deposits.
–. Upon. completion. re-assemble. the.
unit.in.the.opposite.way.as.described.
above. taking. care. to. respect. the.
indicated.measurements.
RONDO' 3/4 OF
ESTELLE 3/4 OF
RONDO' 5/6 OF
ESTELLE 5/6 OF
4.7.3
Substitution of nozzle
The. nozzle. should. be. substituted. at.
the.beginning.of.every.heating.system.
for.guaranteeing.the.correct.fuel.flow.
and.a.good.spray.efficiency..
The.nozzle.is.substituted.in.the.follow-
ing.manner:
–. Disconnect. the. high. tension. cables.
Fig..14
Fig..15
83

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Aqua he 35 erp beAqua he 25 inox erpAqua he be 35 inox erp be

Tabla de contenido