STEINEL L 830 SC Manual página 36

Ocultar thumbs Ver también para L 830 SC:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 77
5� Mounting
• Check all components for damage.
• Do not use the product if it is damaged.
• When installing the sensor-switched light, make sure the installation site is
not exposed to vibration.
• Select an appropriate mounting location, taking the reach and motion
detection into consideration.
Mounting procedure (L 830, L 835, L 840 SC/C)
• Switch OFF power supply. (Fig� 4�1)
• Undo retaining screws and detach light cube from the wall mount. (Fig� 5�1)
• Mark drill holes (Fig� 5�2)
• Drill holes and fit wall plugs. (Fig� 5�3)
• Pierce sealing plug.
• Installation with concealed power supply lead (Fig� 5�4)
• Installation with surface-mounted power supply lead (Fig� 5�5)
• Connect conductors (Fig� 5�6)
• Fit light cube onto wall mount (Fig� 5�7)
• Screw in retaining screws (Fig� 5�7)
• Switch ON power supply (Fig� 5�7)
• Make settings via app (SC only)
➔ "6� Function"
Mounting procedure (GL 80 SC/C)
• Switch OFF power supply (Fig� 4�1)
• Undo retaining screw and remove light cube from the cover (Fig� 5�8)
• Pull cable through base plate and profile (Fig� 5�9)
• Screw base plate to profile (Fig� 5�10)
• Mark base plate drill holes (Fig� 5�11)
• Drill holes and insert screw anchors (Fig� 5�12)
• Screw base plate to the floor/ground (Fig� 5�13)
• Screw cover onto profile (Fig� 5�14)
• Connect conductors (Fig� 5�15)
• Fit light cube to cover (Fig� 5�16)
• Screw in retaining screw (Fig� 5�16)
• Switch ON power supply (Fig� 5�16)
• Make settings via app (SC only)
➔ "6� Function"
6� Function
The functions can be set for the SC types.
Functions are set via the Smart Remote app.
- 36 -

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

L 830 cL 835 scL 835 cL 840 scL 840 cGl 80 sc ... Mostrar todo

Tabla de contenido