INSTALLATION INSTRUCTIONS
Questions? Visit our Website at: haierappliances.com
BEFORE YOU BEGIN
Read these instructions completely and carefully.
IMPORTANT –
•
for local inspector's use.
IMPORTANT –
•
codes and ordinances.
• Note to Installer – Be sure to leave these
instructions with the Consumer.
• Note to Consumer – Keep these instructions for
future reference.
• Skill level – Installation of this appliance requires
basic mechanical skills.
• Completion time – Approximately 1 hour
• We recommend that two people install
this product.
• Proper installation is the responsibility
of the installer.
• Product failure due to improper installation is not
covered under the Warranty.
• You MUST use all supplied parts and use proper
installation procedures as described in these
instructions when installing this air conditioner.
ELECTRICAL
REQUIREMENTS
These models require a 115/120-volt AC, 60-Hz
grounded outlet protected with a 15-amp
time-delay fuse or circuit breaker.
The 3-prong grounding plug minimizes the
possibility of electric shock hazard. If the wall outlet
you plan to use is only a 2-prong outlet, it is your
responsibility to have it replaced with a properly
grounded 3-prong wall outlet.
CAUTION
Do not, under any circumstances, cut or remove the
third (ground) prong from the power cord.
Do not change the plug on the power cord of this air
conditioner.
Aluminum house wiring may present special problems—
consult a qualified electrician.
Power cord includes a current interrupter device. A test
and reset button is provided on the plug case. The device
should be tested on a periodic basis by first pressing the
TEST
into the outlet. If the TEST
the RESET
use of the air conditioner and contact a qualified service
technician.
10
Save these instructions
Observe all governing
RESET
UNPACKING THE AIR CONDITIONER
WARNING
EXCESSIVE WEIGHT HAZARD - When moving or lifting
the air conditioner, use two or more people. Wear gloves
when handling the air conditioner to protect against
possible sharp edges and metal fins.
Remove Packaging Materials
• Remove packaging materials. Save the carton and
the foam packaging for storing the unit when not in
use.
NOTE: There is NO internal packing material inside
the air conditioner to remove - DO NOT open the
cabinet.
• Handle the air conditioner gently.
• Keep the air conditioner upright and level. Do not
set the air conditioner on its side, front, back or
upside down.
• The air conditioner must be standing upright for 2
hours prior to installation and operation.
TOOLS YOU WILL NEED
Phillips head screwdriver
Drill and 1/8" drill bit
Pencil
Level
Ruler or tape measure
Scissors or knife
49-5000454 Rev. 2