Assembly and Operation Instructions
881 and 881CT—Floor Operation (cont'd)
6. Select the shoe for the size of conduit to be bent.
Insert the shoe with the shoe size marking facing
up. Apply a light coat of high pressure grease to the
yoke pin then align either the EMT or Rigid/IMC hole
with the yoke and insert the yoke pin (G). Secure the
yoke pin with a hitch pin clip (E).
7. Remove one hitch pin clip from the roller shaft.
Greenlee Tools, Inc.
881 and 881CT Hydraulic Benders
8. Lift the connecting bar and insert the follow bar.
Note: Insert the end marked START.
9. Reinsert the hitch pin clip into the roller shaft.
7
4455 Boeing Dr. • Rockford, IL 61109-2988 USA • 815-397-7070