Final Installation Checklist; Operation Checklist - GE PTS9200 Instrucciones De Instalación

Ocultar thumbs Ver también para PTS9200:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation Instructions

12 FINAL INSTALLATION CHECKLIST

Check to make sure the circuit breaker is closed (RESET) or the circuit fuses are replaced.
Be sure power is in service to the building.
Check that all packing material and tape have been removed. Failure to remove these materials could result in
damage to the appliance once the appliance has been turned on and surfaces have heated.
Remove all items from inside the oven.
Check to be sure that the mounting screws are installed and flush with the side trim (see Section 9).
Check that the bottom trim is installed properly (see Section 10).
Ensure that air duct opening at bottom of unit is free of obstructions.
Check that oven racks function smoothly.

OPERATION CHECKLIST

Turn on the power to the oven (refer to your Owner's Manual). Verify that the bake and broil units and all cooking
functions operate properly.
See your Owner's Manual for the troubleshooting list.
Be sure all of the oven controls are OFF before leaving the oven.
31-2000374 Rev. 1
11

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Cts92dm

Tabla de contenido