A6 Persistent memory reset (Used when the spa is powering up to restore factory
A2, A3 and A4 work in combinatio to determine the number of high-speed devices
and blowers that can run before the heat is disabled. f.e. A2 and A3 in the ON position
and A4 in the OFF position will allow the heater to operate with up to 3 high-speed
pumps (or two HS Pumps and Blower) runing at the same time. Heat is disabled when
the fourth high-speed pump or blower is turned on.
Note: A2/A3/A4 all ogg = No heat with any high-speed pump or blower.
Assignable DIP Switches
A7 In "ON" position, enables a 5-minutes cool down for some gas heaters (Cooling
Time B). In "OFF" position, enables a 1-minute cool down for electric heaters (Cooling
Time A).
Undesignted switches are not assigned a function.
"Low Amp" and the "High Amp" power.
Special Features
CABLE SECTION
To determine the cable section of the electrical installation, see the values indicated
in this sheet and the following table:
2,1
2,5
Distance
6 - 11 m
2,5
2,5
11 - 15 m
2,5
2,5
15 - 20 m
4
For longer distances, increase the cable section accordingly.
phase line (3 x 16A) to cover the power required by the Spa.
further on in this Installation Manual.
The manufacturer shall not be responsible for any damage caused by an improper
KW required
2,8
3,2
3,5
2,5
2,5
4
4
4
4
4
4
6
6
4,4
5,3
6,2
7,0
2
4
6
10
10
6
6
10
10
6
10
10
10
ENG
015
7,9
8,8
10
10
10
10
16
16
25