ECOFOREST VAP 5-20 Manual De Instalación Y Mantenimiento página 56

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 1

Exchanger top lining.

Heat exchanger cover.

Cylinder positioner.

Cylinder of the turbulator. Stage 2. (x7)

Cylinder of the turbulator. Stage 1. (x7)

Helical coupler positioned.

Helical coupler of the turbulator. Stage 2. (x7)

Helical coupler of the turbulator. Stage 1. (x7)
Once the discharge connection has been disassembled, we shall clean the system parts and the smoke ways.
When the cleaning is over, re-assemble the system.
5.3.
Fireplace.
Clean the walls of the combustion chamber, as well as the basket (see sections 5.14 and 5.15).

Access to the boiler's main body assembly.
55
Drawing 22
Drawing 23

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Vap 24Vap 30

Tabla de contenido