Mounting Preparations - Good Earth Lighting SE1249-BP2-02LF7-G Manual De Instrucciones

Ocultar thumbs Ver también para SE1249-BP2-02LF7-G:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Adjust the mounting arms
After unpacking the light, loosen
1
both star knobs on the mounting
arms located on the back of the
fixture.
Pivot joint
NOTE: The PIR sensor and light head must be mounted with the control
panel facing toward the ground to prevent water from damaging the
fixture. Failure to do so will void the warranty.
OPTION 1: WALL MOUNT
2a
OPTION 2: EAVE MOUNT
2b

Mounting Preparations

Elbow joint
marks on the elbow joint and then on the pivot
joint, the mounting arm is articulated for EAVE
MOUNT installation.
Align the "-" marks on the elbow joint and pivot joint. Tighten both star knobs.
Align the "=" marks on the elbow joint and pivot joint. Tighten both star knobs.
The arms have position hash marks
to aid in the installation for both
STANDARD WALL MOUNT and
STANDARD EAVE MOUNT. By aligning
the hash marks ("-" and "="), the arm
will be positioned for two very di erent
configurations. By aligning the "-" marks
on the elbow joint and then on the pivot
joint, the mounting arm is articulated for
WALL MOUNT installation. By aligning the "="
DO NOT EAVE MOUNT ON PERFORATED
OR CHANNELED SOFFIT MATERIAL!
3 WAYS TO
MOUNT:
WALL MOUNT
EAVE MOUNT
BOX MOUNT
5

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Se1249-wh3-02lf7-g

Tabla de contenido