Descargar Imprimir esta página

GASPARDO VITIGREEN Empleo Y Mantenimiento página 33

Ocultar thumbs Ver también para VITIGREEN:

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

4.0 MAINTENANCE
Here follows a list of various maintenance operations to be carried
out periodically. Lowered operating costs and a longer lasting
seeding machine depend, among others, on the methodical and
constant observation of mese rules.
- The maintenance periods listed in this booklet are only indi-
cative and are for on normal conditions on use, therefore be
varied depending the kind of service, the more or less dusty
surroundings, seasonal factors, etc. For more serious
conditions of service, maintenance will logically be done more
often.
- Before injecting grease, the nipples must be cleaned to avoid
mud, dustand foreign bodies from mixing with the grease,
otherwise they will reduce or even annul the effect of the
lubrication.
ATTENTION
- Always keep oils and grease out of reach of children.
- Always read warnings and precautions indicated on the
containers carefully.
- Avoid skin-contact.
- After use wash the equipment thoroughly.
- Treat the used oils and polluting liquids in conformity with the
laws in force.
4.1 WHEN THE MACHINE lS NEW
- After the first eight hours of work check that all the bolts are still
tight.
- Before starting the seeding operation grease all parts indicated
by transfer nr. 7 ('GRASE') at page 25 of this leaflet.
4.2 EVERY 20/30 WORKING HOURS
- Check the tightness of the bolts.
- Grease the drive chains.
4.3 EVERY 50 WORKING HOURS
- Clean the distributor carefully and thoroughly.
4.4 SETTING ASIDE
At the end of the season, or if a long period of rest is for seen it is
advisable:
- Carefully empty all the seed from the hopper and distribution
ass'y.
- Wash the equipment with a lot of water, especially the tanks of
the chemical substances, and then dry them.
- Carefully check worn or damaged parts and replace if
necessary.
- Tighten all screws and bolts.
- Grease the drive chains, spread lubricant on all the parts not
painted.
- Protect the equipment with a (nylon) cover.
- Then put it in a dry place, do not move it and where it is out of
reach of un authorized people.
If these operations are done carefully, it will be to the total
advantage of the user because when work is recommenced, he
will find the equipment in perfect conditions.
cod. G19502451
CAUTION
USE AND MAINTENANCE
5.0 DEMOLITION AND DISPOSAL
This operation is to be carried out by the customer.
Before demolishing the machine, you are advised to carefully
check its physical condition and ascertain whether there are any
parts of the structure that may be susceptible to structural collapse
or breakage during demolition.
The customer should operate in compliance with the environment
protection laws in force in his/her country.
The machine demolition operations should be carried out by
skilled personnel only, equipped with suitable protective
clothing (safety footwear and gloves) and auxiliary tools and
equipment.
All the disassembly operations for demolition should be carried
out with the machine stopped and detached from the tractor.
Before demolishing the machine, you are advised to render
harmless all the parts that may be a source of danger and
therefore:
- scrap the structure using specialized firms,
- remove any electrical apparatus according to the laws in force,
- collect oils and greases separately, to be disposed of through
specialized firms, in accordance with the regulations of the
country in which the machine was used.
When the machine is demolished the CE mark should be
destroyed together with this manual.
Finally, we remind you that the manufacturer is always available
for any and all necessary assistance and spares.
g
ENGLISH
CAUTION
CAUTION
33

Publicidad

loading