INSTALLATION PROCEDURE — LARGE COVER
1. Determine the installation location
of the studs and water supply pipe
relative to the position of the toilet.
2. If needed, slide a thread solder
adapter on the water supply pipe.
3. Attach the control stop to the pipe.
4. Bore a guide hole for the flush pipe
into the wall.
NOTE: Attach the control stop before
installing the box fixing frame.
Thread sealing compounds
should be used on the male
NPT threads only.
NOTE: For reclaimed water, do not
use standard vacuum breaker
or control stop.
NOTE: Do not use petroleum based
products or pipe sealants.
For use with a left water supply,
detach the controller and remount it
to opposite side of valve body.
Protect the wire connections
inside the controller's case.
5. Fasten the base frame to the studs with
four screws (prepared on site) after
adjusting it. ( A )
6. Secure the box with four screws in the
adjustable plate. ( B )
Left water supply
1" NPT (toilet)
Sensor location
3-7/16" (87 mm)
Stud
* 14-3/4" ‡
from top
Toilet top spud
of fixture
Ø2-3/16" (Ø56 mm) hole
(toilet)
Toilet back spud
Ø2-3/16" (Ø56 mm) hole
* X", ‡ = At least 5" clearance from sensor to tip of toilet seat
up position or to top of grab bar is required to avoid false
detection.
** Opening in wall
Detach
Base frame
Adjustable hole
Adjustable hole
- 7 -
4-3/4" ± 1/2"
(120 ± 13 mm)
Right water supply
1" NPT (toilet)
CL of sensor
** 13-1/2"
(343 mm)
Valve body
Remount
Adjustable
plate
* X"