Descargar Imprimir esta página

Tecno-gaz ORION 40 Manual De Instrucciones página 20

Ocultar thumbs Ver también para ORION 40:

Publicidad

Idiomas disponibles

Idiomas disponibles

TECNO-GAZ
Battery
charger
capacity
20-200Ah
20-200Ah
Parameters
Indicators
CAUTION
CAUTION
Accessory manual
Charge
Charge
current
voltage
5 A
29.4 V
2 A
29.4 V
5.3.3 Parameters and indicators
On the front of the GBA the following information can be displayed:
Battery voltage displayed by means of voltmeter.
Battery charger charge current by means of ammeter.
Green indicator showing supply of mains power voltage.
Green indicator showing main lamp (1) operating.
Green indicator showing satellite lamp (2) operating.
Battery charger indicator with colours indicated at para, 5.2.2.
5.3.4 Maintenance
The GBA does not require any particular routine maintenance.
Clean it inside once a year using compressed air to remove dust from the
component parts and make sure the connections are tight.
5.3.5 First switch-on
The batteries are dispatched charged and disconnected with the battery
fuse (F13) attached separately.
The first step is to connect the batteries by means of the faston.
Position the battery fuse.
Connect the GBA to the power mains and then the lamps to the GBA as
shown on the wiring diagram.
Before energizing the system, make sure all the fuses are engaged.
Energize the system and make sure the GBA is working properly in both
the charging and discharging cycle.
MA_001
Rev.0
Stability
Timer
voltage
27.4 V
4h ± 30min
27.4 V
9h ± 30min
01/09/15
EN
Pag. 22 di 24
Protection
Fuse
230V
Fuse
110V

Publicidad

loading

Este manual también es adecuado para:

Orion 40dsOrion 60Orion 80