TECNO-GAZ
See drawing 159
See drawing 164
Accessory manual
1.4 WA1 and WA2 cable positioning (optional)
WARNING – Before fastening the central block of the structure to the
bar, fit the bar cables by running these inside the pin
In order to insert the monitor cable, the two screws (2) will have to be
loosened and the cover (1) of the central hub will have to be removed to
gain access to the compartment.
Remove the cable from the holes (3) of the pin and wrap it around this
twice, leaving it loose and not tight. Afterwards insert the cable inside the
horizontal arm.
Remove the screws (4) and the plastic cap (5) to facilitate the insertion of
the cable inside the side pin.
Remove the two opposite outer covers (6) levering with a flat-head
screwdriver. Remove the two opposite protections (8) inserting a pin or a
screwdriver inside the holes (7) and press on both sides at the same time.
Insert and run the cable inside the C-shaped lever (9) along the entire
length of the swing arm and insert it in the monitor stand pin. Finally,
remove the cable from the monitor stand hole and connect the connectors.
If necessary, remove the closing cap (10).
Reposition the removed covers (6,8,10).
1.5 Calibration of swing arm and horizontal arm stop
(VA, VATVCC, WA1, WA2)
WARNING – always insert the stop screw. Failure to do so could
If, after monitor installation, the arm is not stable in the set position,
regulate compression.
Loosen the screws (2) and remove the cover (1).
By means of the adjustment pin (4) rotate the lever upwards and load the
spring, if the arm tends to drop, or downwards to unload the spring, if the
arm tends to lift up.
The swinging movement of the arm can also be adjusted upwards.
The Product is delivered without any swinging limits. To reduce upward
swinging, fit the pin in the ring nut (3) and rotate it downwards until it is in
MA_001
Rev.0
damage and break the cable.
01/09/15
EN
Pag. 6 di 24