TECNO-GAZ
See drawing 188
See drawing 158
Accessory manual
Align and fit the monitor stand (2) on the pin of the swing arm (1).
Fit the washers (3) (4) following the instructions and in the following order:
-
Brass spacer washer (3);
-
Teflon spacer (4);
-
Brass spacer washer (3).
Fasten the snap ring (5) to the pin using suitable pliers.
Fasten the closing cap (6) using the three screws (7).
Take the cables out of the hole as shown on the drawing.
1.3 WA1 and WA2 monitor installation and adjustment
Installation. Install the monitor (1) on the stand and tighten by means of
the 4 knobs (2) and relative washers (3).
The structure is supplied with power cables with earth and signal cables
with BNC terminals. Join the cables (4) coming out of the structure to the
specific connectors.
At the customer's request, the structure can also be supplied without
cables. To fit the cables inside the structure, follow the instructions in
paragraph 1.3 Cable positioning.
Adjustment. Loosen the 8 screws (5) and adjust the support so as to
centre it on the hub as shown on the attached drawing, to prevent monitor
tilting problems.
By loosening the knobs (2), the horizontal position of the monitor can be
adjusted, while by loosening the two knobs (6) the swinging movement can
be adjusted.
The arm is sold calibrated to support a monitor weighing about 8 kg. If,
after monitor installation, the arm does not stably maintain the set position,
the balance will have to be adjusted as indicated in paragraph 1.4.
MA_001
01/09/15
Rev.0
Pag. 5 di 24
EN