FIG. 10
15. Slide elastic straps and sleeve of Ball Ramp with Side Netting (#13) onto Top Net Hanger Tubes as shown in
FIG. 10A & 10B.
16. Slide the Ramp U Tube (#11) into the sleeve of Ball Ramp with Side Netting(#13) as shown in FIG. 10C.
17. Connect the Ramp U Tube (#11) to the Ramp L Tubes (#10) using spring lock as shown in FIG. 10D.
18. Slide the Horizontal Tube (#12) in front of the Ball Ramp with Side Netting (#13) and attach it to the Ramp U
Tube (#11) using Bolts (#24), Washers (#22) and Nuts (#27) as shown in FIG.10E.
FIG.10B
13
11
FIG.10
FIG.10C
FIG.10D
#34
Spring Lock
13
11
10
8
FIG.10A
13
FIG.10E
27
12
22
11
24