HOW TO INSTALL THE APPLIANCE
· Mark the position of each support, the connecting pipes and discharge
of the condensate, of the electrical cables and power commands (see
dimensions). The cardboard template can be supplied with help in this
operation.
· Choose the most suitable stay rods, depending on the type of ceiling
(Fig.1).
· Hang up the bearing brackets supplied with the appliance. Take care
to keep them a certain distance (135 mm) from the false ceiling. Do not
tighten the nut or check nut. This will only be done after the unit is level-
led, at the end of the installation phase.
• First, position the connecting pipes as per section "Connecting the
water" and to make the installation more quickly and easily remove "T".
· Lift the unit (without the frame) with care by holding it at the four cor-
ners.
· Tilt the unit and fit it into the false ceiling (1). Match the side slots (2) to
the four bearing brackets (3) as shown in Fig.2.
· Fit the brackets into the slots and tighten the supplied safety screws.
If the height of the false ceiling is 300 mm (the minimum allowed), it
may be necessary to temporarily remove a few of the "T" sections that
support it.
· Level the appliance with a level and allow 30 mm between the sheet
metal casing and the lower surface of the false ceiling (Fig.3).
· Connect the condensation drain pipes and make the wet connections,
then check to make sure that the appliance is still level.
INSTALLATION
Fig. 1
FALSE CEILING
Fig. 2
Fig. 3
35