INSTALLATION INSTRUCTIONS
After the front and rear shells are installed, check whether there is a loose gap between the front and
rear shells. Make sure that there is no loose gap.
INSTALLATION OF THE CABLE HOLDER
1. Take out the charger holder.
2. Find a suitable location near the EV charger box, which must be more than 0.5m above the bottom surface
and not higher than 1.5m.
3. Align the charger holder in position and mark the four mounting holes.
4. Drill the 4 holes as the marks at dia 6mm, 35mm deep.
5. Insert the wall expansion plug.
6. Screw the charger holder to the wall.
7. Installation is complete.
1. There is a clicking sound when the tip is inserted.
2. When pulling out the charger, you must first press the lock button and pull out the charger at the same time.
Tuck the Sealing rubber into the housing from the outside in. Insert
it with angle level, allowing its seal groove to fit into the housing.
THE INSTRUCTION OF THE CABLE HOLDER
With angle level
fig. 8
Wall Plugs
M6*30
14
Screw
ST4.2*32
V.1