Commissioning, Operation - WIKA BCS10 Manual De Instrucciones

Ocultar thumbs Ver también para BCS10:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

6. Commissioning, operation

6. Commissioning, operation
Commissioning must only be carried out by trained skilled personnel. The calibration
system was comprehensively checked ex works for leak tightness.
EN
6.1 Switching on and off
To switch on the calibration system, press
the Power button
the Power button again to switch off the
calibration system.
After switching on the version of the firmware
is indicated on the display for approx.
1 second.
The bar graph display at the bottom of the
display indicates the applied pressure relative
to the total measuring range.
6.2 Backlighting
The backlighting makes it easier to read the
values of the digital display. Press the Scroll-
Down button (5) to turn the backlighting on
and off.
6.3 Description of menu items
A detailed description of the menu items is available in the operating instructions of the
digital gas density indicator model GDI-100-D.
6.4 Measurement setup and adjustment
14
WARNING!
Only connect or disconnect test and calibration installations once the
system has been depressurised!
(1) for 3
seconds. Press
WARNING!
Only connect or disconnect test and calibration installations once the
system has been depressurised!
WIKA operating instructions calibration system, model BCS10

Publicidad

Tabla de contenido
loading

Tabla de contenido