Maximum Dry Load
Spin Speed
Installation
Unpacking
All transit bolts and packing must be removed
before using the appliance.
You are advised to keep all transit devices so
that they can be refitted if the machine ever has
to be transported again.
1. After removing all the packaging, carefully
lay machine on it's back to remove the poly-
styrene base from the bottom.
2. Remove the power supply cable and the
draining hose from the hose holders on the
rear of the appliance.
3. Unscrew the three bolts.
www.zanussi.com
Cotton
Cotton Big Capacity
Synthetic
Maximum
4. Slide out the relevant plastic spacers.
5. Open the porthole. Remove the polystyrene
6. Fill the smaller upper hole and the two large
3,5 Kg
4 Kg
2 Kg
1400 rpm
block fitted on the door seal. Remove from
the drum the objects supplied with the ma-
chine.
ones with the corresponding plastic plug
caps supplied in the bag containing the in-
struction booklet.
2
1
25