Descargar Imprimir esta página

ELICA ESL642S3 Guía De Instalación, Uso Y Mantenimiento página 8

Publicidad

Idiomas disponibles

Idiomas disponibles

Example B
NOTE: Top view ceiling joists
parallel to front of hood
16"
(40.6 cm)
over duct/cooktop
joist spacing
7
"
1
1 6
(17.9cm)
Install Range Hood
1
Place the template in the ceiling considering the
instructions for ceiling support structures.
NOTE: Always consider the front of hood legend when
playing the template on the ceiling.
It will define the control's location.
2
Mark with a pencil the hole locations for screws and
duct in the ceiling.
8
10
" (25.5 cm)
1
1 6
install cross-
framing
symmetrically
Centerline
2 x 4 cross
framing
Ø 6
" (15.9
1
4
cm) duct
Align duct to
Cooktop
center of cooktop
outline
Hood front
Example C
NOTE: Top view ceiling joists
parallel to front of hood
10
" (25.5 cm)
1
1 6
install cross-framing
symmetrically over
duct/cooktop
7
"
1
1 6
(17.9cm)
16"
(40.6 cm)
joist spacing
Hood front
3
Fix the upper horizontal support with 4 - 5 x 45 mm
screws.
4
Install the 6" (15.2 cm) round transition with 2 - 3.5 x 9.5 mm
screws.
A
B
A.
6" round transition
B.
Hood assembly
C.
2 - 3.5 x 9.5 mm screws
Centerline
2 x 4 cross
framing
Ø 6
" (15.9
1
4
cm) duct
Align duct to
Cooktop
center of cooktop
outline
C

Publicidad

loading

Este manual también es adecuado para:

Esl636s3