Descargar Imprimir esta página

John Bean B 500 Manual Del Operador página 124

Publicidad

124
ii-1
ii-2
Installation
ii Transport, unpacking and contents
Carriage instructions
The wheel balancer is supplied on a pallet.
• Use a pallet truck (Figure ii-1) to bring the unit to
its working area.
Unpacking
WARNING: PREVENT THE STRAPS FROM
SPRINGING LOOSE AFTER BEING CUT.
• Cut the straps.
• Open the top of the box.
• Remove staples at the bottom of the box. Lift the
box up and over the unit.
• Carefully unwrap the balancer and spare parts
supplied.
• Check the contents of the shipment.
Contents
The shipment contains:
-
a wheel balancer with Declaration of Conformity
(EC).
-
an Operator's Manual.
-
the accessories mentioned in Section 3.1 of the
Operator's Manual.
-
3 threaded pins with accessory support plate.
-
a mains power cable.
-
a wheel guard assembly.
Tools required
-
screwdriver / bar (diameter 4.5-5 mm)
-
wrenches: 13mm, 17 mm
Positioning
• Remove the bolts that secure the wheel balancer
on the pallet.
WARNING:
DO NOT LIFT OR MOVE THE WHEEL BALANCER
BY THE MAIN SHAFT OR MEASURING UNIT.
Refer to Figure ii-2.
• Move the wheel balancer from the pallet to its
working location.
Note: To handle the unit, preferably use the
accessory support pins (mount as
instructed in section iii) and/or the wheel
guard shaft.

Publicidad

loading