Descargar Imprimir esta página

Garland GEISER 491 FE Manual De Instrucciones página 23

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 1
- It is also recommended to install a filter for
particles at the end of the tube or hose to avoid dirt
particles entering the pump and blocking it.
5.2.2. IMPULSION CONNECTION
Connect the impulsion tube using a 1¨ male connector
to the aspiration of the pump.
If you use a hose instead of a tube for aspiration
make sure that the hose is adequate and depression
resistant.
If the installation is fixed, we recommend using a
flexible metallic hose to avoid transmitting noise and
vibrations to the installation.
5.2.3. ELECTRIC CONNECTION
It is obligatory to connect the machine to a mains
switch protected by a residual differential equal
to or less than 30mA. Electricity tension should
be 230v, frequency 50Hz and have a magnet and
thermic switch between 10A-16A.
When using a cable extension, make sure that
its minimum section is 1.5mm2 and no longer
than 25 metres, always unrolled and adequate for
outdoor use. The use of the cable extension adequate
for outdoor use, reduces the risk of electric shock.
Place the cable extension in such a way that it does
not touch the water and that it will not fall into the
water when the pump starts working. The cable
extension must always be well away from the water
and dry.
Connect the pump to the mains.
6. MACHINE USAGE
Use this machine only for jobs for which it has
been designed. The use of this machine for any other
jobs is dangerous and can cause dangers to the users
and/or to the machine.
Do not rely solely on the security elements of the
machine.
6.1. CHECKING POINTS PRIOR TO START UP
It is important to check that all parts are well
tightened. If you detect any anomaly, stop the machine
straight away and check the machine carefully. In case
of any water leakages, check the installation carefully.
Never carrying on working if the machine is not
working correctly.
6.2. START UP AND STOPPAGE
6.2.1. START UP AFTER INSTALLATION (PRIMING)
1. Open the filler cap (8)
2. Pour water through the hole until the water is full.
3. Screw in the fill cap.
4. Open the circuit for aspiration and impulsion.
5. Open the circuit to allow the air to flow out and the
water to flow in.
6. Connect the pump to the mains and put the ON/
OFF switch in the position ¨I¨. The pump will start.
This lasts several seconds and during that time
the noise of the machine will change from
loud when aspirating water and air to silent when
aspirating only water. After these few seconds, only
water should flow out.
Note: If after some time the pump does not only
23/88
English

Publicidad

loading