Installation; Overview; Lifting Instructions - ESAB Warrior Feed 304 Manual De Instrucciones

Ocultar thumbs Ver también para Warrior Feed 304:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

4 INSTALLATION

4
INSTALLATION
4.1

Overview

The installation must be carried out by a professional.
WARNING!
When welding in an environment with increased electrical danger, only power
sources intended for this environment may be used. These power sources are
marked with the symbol
4.2

Lifting Instructions

CAUTION!
Risk of crushing when lifting the wire feeder. Mounting a large wire bobbin (Ø 440
mm), may change the centre of gravity of the wire feeder and increase the risk of
tipping and crushing. Protect yourself and warn bystanders of the risk.
CAUTION!
To avoid personal injury and / or equipment damage, lift using method and
attachment points shown here.
Ordering number for the lifting eye can be found in chapter "Order Number".
NOTE!
If another mounting device is used, this should be insulated from the wire feed
unit.
.
- 65 -
© ESAB AB

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Warrior feed 304w

Tabla de contenido