Descargar Imprimir esta página

Daikin LMSEY1A09AVM01 Manual De Instalación página 10

Ocultar thumbs Ver también para LMSEY1A09AVM01:

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 119
5 Installation
5.2
Tools needed for installation
a
e
a
Torque screwdriver with Phillips bits
b
Flat screwdriver
c
Phillips head screwdriver
d
Metric spanner set (size 13)
e
Saw
f
Driller with Ø28 mm dril bit
INFORMATION
Choose the correct saw in function of the wall thickness of
the cold room. Make sure the blade is long enough to cut
through the entire wall panel.
5.3
Opening and closing the unit
5.3.1
To open the unit
DANGER: RISK OF ELECTROCUTION
Do NOT leave the unit unattended when the service cover
is removed.
To access the interior of the unit condenser, the front panel must be
removed.
1 Remove the front panel (a) by lifting it, and then pulling it away
from the unit. The panel is attached by hooks (c) on the front
panel that lock into slots (d) on the side and bottom panels.
a
b
a
1
2
a
Front panel
b
Side panel
c
Hook
d
Slot
Installation manual
10
b
c
d
f
b
a
c
c
d
5.3.2
To open the switchbox cover
The options alarm, LAN connection between multiple units and
router are not pre-wired. To make these connections, the electrical
switchbox must be removed.
1 Remove the screw (a) completely.
2 Loosen the screws (b).
3 Remove the cover (c) by sliding it downwards, and then pulling
it away from the unit.
a
b
  5‒1 For LMSEY1A09+13
a
b
c
  5‒2 For LMSEY2A19+25
a
Screw
b
Screw
c
Electrical box cover
5.3.3
To close the unit
1 Reinstall the switchbox cover.
2 Reinstall the front panel.
5.4
Mounting the unit
5.4.1
Precautions when mounting the unit
INFORMATION
See the precautions and requirements in the "2  General
safety precautions" [ 4  2] chapter.
c
b
1
2
b
a
1
2
LMSEY1A09/13 + LMSEY2A19/25
Daikin LMS
4P728170-1B – 2023.07

Publicidad

loading

Este manual también es adecuado para:

Lmsey1a13avm01Lmsey2a19aye01Lmsey2a25aye01