a
c
b
b
a
Primary unit
b
Secondary unit
c
Router (optional)
d
Fieldbus connector (J5)
e
BMS connector (J4)
3 Connect the BMS connector (J4) of the primary unit to the
router (optional). See "5.9 To connect a router" [ 4 17].
4 Interconnect the BMS connectors (J4) of the secondary units.
One to four secondary units can be connected.
CAUTION
Do NOT push or place redundant cable length into the unit.
INFORMATION
The primary unit will perform all the monitoring and control
functions.
5.7
Installing the options in the cold
room
5.7.1
To install the door microswitch
The door microswitch interrupts the unit operation and controls the
cold room lamp (if installed) when the cold room door is opened.
INFORMATION
This manual only describes installation instructions specific
to this unit. For carrying out mechanical work on the cold
room, the instructions of the cold room manufacturer must
always be followed.
a
a
Unit condenser
b
Wire (5 m long)
c
Wire label
d
Door microswitch
LMSEY1A09/13 + LMSEY2A19/25
Daikin LMS
4P728170-1B – 2023.07
d e
b
b
b
c
d
1 Install the door microswitch (d) at the cold room door. Install it
such that the microswitch is operated when the door is closed.
In case of cable or switch failure, the unit will react as if the door
is opened.
2 Guide the microswitch cable labelled C4 (5 m long) coming out
of the unit condenser over the roof of the cold room towards the
door microswitch (d).
NOTICE
Check the wire labels. The door heater wire is a live wire
(220-240 V), while the microswitch wire is a signal wire.
Swapping the wires will cause serious damage to the unit.
CAUTION
Do NOT push or place redundant cable length into the unit.
3 Fix the wiring to the cold room as needed.
4 Connect the wiring to the NO contact of the microswitch. When
the door is closed, the contact must be closed too.
5.7.2
To install the cold room lamp
The cold room lamp is controlled by the user interface. The user
interface is triggered by the cold room door microswitch (see
"5.7.1 To install the door microswitch" [ 4 15]). The lamp switches on
when the cold room door is opened and switches off when the door
is closed.
INFORMATION
This manual only describes installation instructions specific
to this unit. For carrying out mechanical work on the cold
room, the instructions of the cold room manufacturer must
always be followed.
a
a
Unit evaporator
b
Wire (2 m long)
c
Cold room lamp
1 Install the cold room lamp on the cold room ceiling.
2 Guide the cold room lamp cable labelled C3 (2 m long) coming
out of the unit evaporator towards the lamp.
3 Fix the wiring to the cold room ceiling as needed.
CAUTION
Do NOT push or place redundant cable length into the unit.
NOTICE
The cold room lamp must be suitable for 220-240 V, and
the total load of the control circuit must NOT exceed 4 A.
INFORMATION
For the cold room lamp, usually a LED bulb of 0.1 A is
used, with a maximum 0.3 A.
4 Connect the wiring to the lamp.
5 Installation
b
c
Installation manual
15