Descargar Imprimir esta página

Daikin BAEF125AWB Manual De Instalación página 15

Ocultar thumbs Ver también para BAEF125AWB:

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 90
3. Attach the corner cover with operation display (5).
* Avoid pulling or impacting the conner cover with the operation display during mounting.
(1) Pass through wire clamp (7), the wire harness of the corner cover with operation display (5) that
comes out from the opening in the corner of the decoration panel.
Secure the wire harness with wire clamp (7) so that the wire harness clamp is in the position shown
in Figure 17.
(2) Pass the wire harness of the corner cover with operation display (5) through the field-wired path
(low current side) of the indoor unit, wiring through-hole 2, the wire clips (2 locations), and the edge
saddle.
In doing so, try not to touch the nearby printed circuit board.
(If passing through the field-wired path (low current side) is difficult, release the unit-latching hook.
Limit the number of unit-latching hooks to simultaneously release to 2 locations.
After the wiring work, be sure to re-lock the released unit-latching hooks.)
(3) Connect the relay harness (small) (6) to the printed circuit board (X40A) (white) of the UV streamer
air purifier unit and the wire harness of the corner cover with operation display (5).
(4) Using clamps (2), respectively secure the wire harness of the corner cover with operation display (5)
and the relay harness (small) (6) to the hook on the control box and any 1 of the lead wires with
protective tube. (Refer to Figure 18.)
(5) Attach the corner cover with operation display (5) to the decoration panel.
In doing so, push the wire harness through the opening to the inside of the ceiling.
* Make sure the wire harness is not caught between the decoration panel and the corner cover with
operation display (5).
English
01_EN_3P701968-3.indd 14
01_EN_3P701968-3.indd 14
14
12/05/2023 15:12:31
12/05/2023 15:12:31

Publicidad

loading