Descargar Imprimir esta página

Daikin BAEF125AWB Manual De Instalación página 7

Ocultar thumbs Ver también para BAEF125AWB:

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 90
4. INSTALLATION OF INDOOR UNIT
<Also refer to the installation manual supplied with the indoor unit.>
WARNING
Make sure the power supply to the indoor and outdoor units are cut off before carrying out any wiring work.
Failure to do so may result in electric shock.
1. Temporarily install the indoor unit.
Adjust the installation height so that the distance between the lifting lug of the indoor unit and the
underside of the ceiling is as shown below.
2. Carry out installation in accordance with the indoor unit installation manual.
Complete all the refrigerant piping, drain piping and electrical wiring work of the indoor unit.
After the installation work is complete, remove the lid of the indoor unit control box.
(Refer to Figure 1.)
English
01_EN_3P701968-3.indd 6
01_EN_3P701968-3.indd 6
Lifting lug
Indoor unit
Underside of the ceiling
Screw
(2 locations)
Loosen the screws (2 locations) and slide the
lid in the direction of the arrow to unhook.
Figure 1
225 to 230 mm for standard panel
Hook
Indoor unit
Control box lid
6
12/05/2023 15:12:25
12/05/2023 15:12:25

Publicidad

loading