STEAM AND HOT-WATER DISPENSING PIPES - This operation must be carried out at the end of each working day
DO NOT
GRILLE AND DRIP BASIN - This operation must be carried out at the end of each working day
2. Extract the basin.
DO NOT
DRAINING TRAY
- This operation must be carried out at the end of each
working day
BODYWORK - This operation must be carried out at the end of each working day