Descargar Imprimir esta página

ULTIMATE SPEED USWB 11 A2 Instrucciones De Funcionamiento Y De Seguridad página 13

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 159
PLEASE NOTE: If the device is only connected to one phase, then use the screw terminal of mains
connection L1
.
30
Now tighten the 2 screws
Screw the cable gland
CAUTION: One-sided phase loading:
If, in a network system of EV chargers (with load management), several vehicles are charged simul-
taneously with single-phase, this can lead to adverse power distribution between the phases. The EV
chargers must therefore be connected with an alternating phase sequence. First EV charger L1, L2, L3.
Second EV charger L2, L3, L1. Third EV charger L3, L1, L2. Fourth EV charger back to L1, L2, L3 etc.
of the strain relief
29
back on tightly.
27
.
28
GB/IE/NI/CY/MT
13

Publicidad

loading