PREPARATION
Before beginning assembly of product, make sure all parts are present. Compare parts with package
contents list and above. If any part is missing or damaged, do not attempt to assemble the product.
Contact customer service for replacement parts.
Note: This guide is a general representation of the installation process. In the case of plumbing
products, every installation is essentially a custom installation and some adjustments may be required
for your specific application.
Estimated Assembly Time: 90 minutes
Tools Required for Assembly (not included): Safety Goggles, Adjustable Wrench, Thread Seal Tape,
Phillips Head Screwdriver, Channel-Lock Pliers.
• Prior to beginning installation, turn off the cold and hot water lines and turn on the old faucet to
release built-up pressure.
• When installing your new faucet, first, hand-tighten connector nuts. Then, use one wrench to hold
the fitting and a second wrench to tighten the nut an additional 1/4 turn. Connections that are too
tight will reduce the integrity of the system.
Before installation, remove handles (E) from valve
body (D).
0-1
E
0-2
4
D