Descargar Imprimir esta página

Pur Line NTW-09 Manual De Instrucciones página 15

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 1
INSTALLATION
Before Installation
- Do not connect the appliance to the electrical supply at this time.
- The screws and plugs supplied with this package are only suitable for SOLID wall installation. For
any walls other than solid, such as cavity, the appropriate fixings MUST be used.
- Unpack the appliance, carefully lift the surround from the carton and stand upright.
- We suggest that you open the fixing pack and place all the contents into a container, therefore
reducing the risk of losing any small pieces.
- Decide on the position where the suite will hang on the wall and determine a height for the
dryer to be fixed. (1500mm from the floor to the top screw fixings is a recommended height).
Step 1
1. Take off the foldable shelf, connecting bars
and fixing bolts, as listed above
2. Fix the connecting bar with mounting
brackets by the fixing bolts. See as figure 1
Step 2
Option A: Fix the dryer by glue
Warning: make sure that the wall (suggested be of ceramic tile) shall be well cleaned and dry
1. Peel off the cover of the adhesive tape on
the wall plugs, and apply glue evenly on the
blank place. As show in Figure 2
2. Affix the wall plug (with the whole foldable
shelf ) on the wall tightly.
EN
13
Figure 1
Figure 2

Publicidad

loading