INSTALLATION INSTRUCTIONS (Continued)
4.
Thread the union tailpiece fittings (BB) onto the hot and
cold water supply pipes and tighten with a wrench.
Hardware Used
BB
Union tailpiece
5.
Slide the union nuts (AA) down the supply pipes and
attach them to the faucet (A). Tighten with a wrench
If soldering the supply lines, remove the rubber o-rings
from each union tailpiece, solder, and then reinsert the
o-rings when cool.
Hardware Used
AA
Union nut
6.
Insert the holding screw (CC) into the single tab on
the back of the faucet (A), and tighten.
Hardware Used
CC
Holding screw
4
2
x
5
x 2
6
x 1
5
BB
AA
A
CC
12
A