3. Attach tube 2 to tubes 3 and 4 using the spring lock (pre-installed) as shown in FIG. 1.
4. Connect tubes 7 and 8 using the spring lock (pre-installed) as shown in FIG. 2.
5. Connect tubes 5 and 6 using the spring lock (pre-installed) as shown in FIG. 3.
-47-