Descargar Imprimir esta página

TeamO Marine 275N Ocean Manual Del Usuario página 4

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 11
Repacking Guide
1
2
Lay lifejacket out flat.
Start with left side of bladder and fold to form a flake
approximately 50mm wide, both sides of the CO
3
Fold bottom of bladder under inflator to fit
within cover. Pass lifting strop between CO
bottle and bladder to hold in place.
5
Flake top of jacket in three folds with sprayhood
on top. Continue to close the zip, closing the
Velcro quick-burst tabs as you go.
6
TEAMOMARINE.COM
bottle.
2
4
Begin to zip up cover to contain bladder and keep
in place inflator to fit within cover. Pass lifting strop
2
between CO2 bottle and bladder to hold in place.
6
Fold in the hood from top left. Continue with the zip
to partially enclose the hood.
7
Now the right side of bladder, fold to form a flake approximately
50mm wide, both sides of the manual air tube and whistle.
9
Fold in the hood from top left. Continue
with the zip to enclose the hood.
10
Zip up to fully enclose the bladder.
8
Fold bottom of bladder under
inflator to fit within cover.
TEAMOMARINE.COM
7

Publicidad

loading

Este manual también es adecuado para:

170n offshore