Power Down Operation (Optional) - Serta Motion Essentials II Manual Del Usuario

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Menu
Table of Contents
To lower base to the fl at position during an electrical power outage,
complete the following procedure:
STEP 1
Verify power supply is unplugged from electrical power source.
STEP 2
Locate (1) power down device and two (2) 9-volt batteries (FIGURE 1).
FIGURE 1
(1) POWER
DEVICE
STEP 3
Install (2) 9-volt batteries in power down device (FIGURE 2).
FIGURE 2
INSTALL ONLY
POWER DOWN
16
Serta
Motion Essentials™ II Owners Manual 99301408-f
®

POWER DOWN OPERATION (OPTIONAL)

DOWN
BATTERIES
ONE WAY IN
DEVICE
(2) 9-VOLT
BATTERIES

Publicidad

Tabla de contenido
loading

Tabla de contenido