Descargar Imprimir esta página

MSW Motor Technics MSW-PLT-W24 Manual De Instrucciones página 107

Publicidad

3) Keep the automatic air release valve open.
4) Full fill the boiler tank by the water, when the tank is filling, can hear the sounds of
air release from the air release valve, when the air release valve be quiet, means the
water already full in the tank, normally need 5~10 minutes.
5) Check the pressure gauge of the heating system, make sure the pressure is not higher
than1.5 Bar, if the pressure is higher than 1.5 Bar, please release some water /
pressure from the heating system.
6) Connect the power cable. Switch one the boiler, turn on the boiler from the display.
Connect WIFI module
1) Down load app
EN

Publicidad

loading