Descargar Imprimir esta página

Wiesenfield WIE-PM-1200B Manual De Instrucciones página 32

Prensa para pellets

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 117
NOTE: The data contained in this information sheet are based on our laboratory research and
technical experience. It provides a general indication of properties, usage and application. For the
proper use of the product, it is necessary for the user to carry out technological tests, taking into
account the specificity of a given technological process.
2) Before connecting the machine:
check that all bolts and screws are tightened.
lubricate the bearings according to the instructions in point 3.4.
set the pressure of the rollers in accordance with the instructions in point 3.4.
when using a new matrix for the first time, it should be sanded in accordance with the
instructions in point 3.4
3) Connect the device to the power supply, then turn it on using the ON button. The engine
should start and the matrix should begin to rotate. If the unit does not work properly after
switching it on, switch it off immediately with the OFF button and look for the cause.
4) Place the granulate container under the chute.
5) Pour a small amount of the mixture to be granulated into the hopper. Throwing in too much
at once may cause the matrix to clog.
CAUTION:
if the raw material is too dry, it will not be pressed properly,
if the raw material is too moist, the pellets will be of poor quality.
the maximum length of the raw material should be approx. 5mm, longer material may clog the
machine and reduce its performance. Too big pieces of raw material should be broken/cut into
smaller particles.
6) After a short time, the pellets will fall into the container under the chute. They will achieve
their final hardness and consistency only after cooling. The moisture content of the finished
pellets should be between 12 and 15%.
7) Proceed in the same way until the mixture is completely processed.
8) After finishing work, turn off the device with the OFF button and disconnect it from the
power supply.
ATTENTION: Do not leave the machine unattended until it has completely cooled down!
NOTE: Do not stop the machine while pressing the pellets, otherwise the machine will become
clogged.
9) Clean the device so that no pellet residues remain on the rollers and in the matrix.
3.4.
Cleaning and maintenance
a)
Pull out the mains plug before each cleaning and when the unit is not in use.
b)
Use only non-corrosive cleaning agents for cleaning the surfaces.
c)
After each cleaning, all the parts should be dried well before the unit is used again.
d)
Store the unit in a dry and cool place protected from moisture and direct sunlight.
e)
Do not spray the unit with a stream of water or immerse it in water.
f)
Make sure that no water enters through the ventilation openings in the casing.
g)
Clean the ventilation openings with a brush and compressed air.
h)
Perform regular inspections of the unit checking technical fitness and any damages.
EN

Publicidad

loading

Este manual también es adecuado para:

Wie-pm-1500bWie-pm-2000bWie-pm-2300bWie-pm-2600bWie-pm-4500