Descargar Imprimir esta página

MSA TransAire 5 Manual De Uso página 13

Publicidad

Idiomas disponibles

Idiomas disponibles

6.3
Hood Packing Instructions for TransAire Apparatus
 
 
US
5.  Inspect the cylinder at least monthly or before each use, to be sure it is FULL 
(2216 or 3000psi on the pressure gauge).
1.  .Lay the hood flat and fold in thirds lengthwise
2.  Fold the top third of the hood over.
3.  Put the hood inlet assembly outside of the hood.
4.  Place the hood into the pouch on the carrier by first inserting the tube into the 
pouch, followed by the folded hood. Leave the hood inlet assembly exposed.
5.  Waist-Mounted (using the optional shoulder strap)
6 Maintaining the Escape Hood
14

Publicidad

loading

Este manual también es adecuado para:

Transaire 10