- Make the hydraulic connections. Too many bends in the
tubes can cause them to break. The water flow direction is
indicated on the unit pipes.
- Connect the condensate drain connection to the drainage
line, and make sure it works.
- Insulate the pipes properly.
- Position the FCWI unit on the template, after passing the
pipes through the hole and into the raceways in the wall.
Check the fan coil is "level", both vertically and horizontally.
- When all these operations have been completed (electric and
REMOVE THE FRAME GRILLE
1. Open the front panel, gripping it by the rounded grooves at the sides and pulling it towards you.
2. Loosen the terminal cover, then take out and disconnect the display card as shown in the picture.
Drain valve
Terminal cover
hydraulic connections, fixing of the fan coil, and condensate
discharge connection), close the hole in the wall with a
suitable filling material.
- Bleed the unit via the heat exchanger valve.
- Complete the reassembly of the unit components, making
sure that no installation material residue is blocking the fan
or obstructing the filters or grilles.
- After completing the installation, run a fan coil operating test.
Screws
Cap
Display card
connection
41