Communication Via 3G (Optional); Connection Process - Ingeteam INGEREV FUSION Street Manual De Instalacion Y Uso

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Connection of accessories
3.
If you wish to connect the station to another one, connect to J17 or J18 (whichever is free).
4.
Press the cable gland to ensure it is sealed, making sure that the cabling is not taut.

7.3. Communication via 3G (optional)

Follow the connection process below to enable 3G communication in the charging station.

7.3.1. Connection process

1.
Install the modem in the control card, located in the rear side of the station door.
ABW2011IQM01_A - Installation and Operation Manual
Ingeteam
EN
ES
FR
IT
27

Publicidad

Tabla de contenido

Solución de problemas

loading

Este manual también es adecuado para:

Ingerev fusion wall

Tabla de contenido