Descargar Imprimir esta página

Zodiac PRO 850 Manual Del Usuario página 27

Ocultar thumbs Ver también para PRO 850:

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

INSTALLATION AND CIRCUIT - Electricity
-
The light + bilge pump switches (also supplied).
-
The fuel gauge holder.
IV-2-5 Wiring preparation
IV-2-5-1 Installing the feedthrough (supplied)
WARNING
2- Find the electrical cables of the
prewired harness. Mark 5
WHEN DRILLING, BE CAREFUL WITH THE TANK
LOCATED JUST UNDERNEATH.
1-Drill in the corner (grey area)
3- Present the clamp to pre-drill
the deck, then drill.
26 / 47
4 -Thread the feedthrough, the
clamp and then attach everything
to the deck. (Seal the screws and
underside of the feedthrough

Publicidad

loading