Descargar Imprimir esta página

Progress Lighting Paso P250109 Serie Manual De Instalación página 11

Ventilador de techo

Publicidad

Idiomas disponibles

Idiomas disponibles

Finishing the Installation
Step 1. Tuck connections neatly into ceiling
outlet box.
Step 2. Slide the canopy up to hanger bracket and
place the key hole on the canopy over the screw
on the hanger bracket, turn canopy until it locks in
place at the narrow section of the key holes. (Fig.
14)
Step 3. Align the circular hole on canopy with
the remaining hole on the hanger bracket, secure
by tightening the two set screws. NOTE: Adjust
the canopy screws as necessary until the canopy
and canopy cover are snug.
Outlet box
Hanger
bracket
Canopy
Figure 14
Installing the battery
Install a 12V
MN21/A23
the remote control. To prevent damage to the
remote control, remove the battery if not used for
long periods. (Fig. 15)
Screws
Canopy
cover
Figure 15
battery (included) into
8.

Publicidad

loading

Este manual también es adecuado para:

Paso p250109-031Paso p250109-163Paso p250109-31m