Descargar Imprimir esta página

3M DBI-SALA 8300009 Instrucciones Para El Usuario página 8

Sistemade pescante de compensación

Publicidad

Idiomas disponibles

Idiomas disponibles

4.
Repeat Steps 2 and 3 for the second Leg Assembly.
POSITIONING THE DAVIT BASE: Figures 6.2 illustrates stabilization and positioning of the Davit Base. To stabilize and
position the Davit Base:
1.
After the desired width for the Davit Base has been set, tighten the Leg Tri-Screws (L) to stabilize the Davit Base.
2.
Move the Davit Base into the established position for the work area. Adjust the Base height and level using the
Adjuster Screws (M) of the Adjustable Feet.
3.
Verify that the Davit Base is level through use of the Level Indicator (N). Adjust as necessary.
INSTALLING THE DAVIT MAST AND ARM: Figure 6.3 illustrates installation of the Davit Mast and Davit Arm. To install
the Davit Mast and Davit Arm:
1.
Insert the Lower Mast (O) into the Base Sleeve (P) of the Center Assembly.
2.
Verify that the Stop Dog (Q) faces the front of the Base Sleeve. The Lower Mast should rotate smoothly through its
range of rotation.
3.
Once it has been confirmed that the Lower Mast is inserted correctly, lock it into position by tightening the Base Tri-
Screw (R). Do not over-tighten since this may interfere with mast rotation.
4.
Install an Upper Mast, if applicable. Only some components may be mounted with two Mast Extensions. See Table 1
for a list of mounting requirements and compatible components.
5.
Install the Davit Arm (S). Ensure that the Locating Key (T) of the Davit Mast completely engages the Key-Way Slot
(U) of the Davit Arm.
8

Publicidad

loading