Descargar Imprimir esta página

Gree Serie Manual De Instalación página 16

Publicidad

Idiomas disponibles

Idiomas disponibles

Be sure to connect the gas pipe after connecting the liquid pipe completely.
4.3.4 Connecting the Pipe at the Outdoor Side Unit
Tighten the flare nut of the connection pipe at the outdoor unit valve
connector. The tightening method is the same as that as at the indoor
side.
4.3.5 Checking the Pipe Connections for Gas Leaking
For both indoor and outdoor unit side, check the joints for gas
leaking by the use
of a gas leakage detector without fail when the pipes
are connected.
4.3.6 Heat Insulation on the Pipe Joints (Indoor Side Only)
Stick coupler heat insulation (large and small) to the place where connecting pipes.
Copyright 2018. This translation is property of GREE PRODUCTS SL. All rights reserved. Total or partial reproduction without its express authorization is prohibited.
DC Inverter U-match Series Floor Ceiling Type Unit
Table 8 Flare nut tightening torque
Pipe Diameter
1/4˝(Inch)
3/8˝(Inch)
5/8˝(Inch)
1/2˝(Inch)
3/4˝(Inch)
7/8˝(Inch)
CAUTION!
Fig.17
14
Tightening Torque
15-30 (N·m)
35-40 (N·m)
60-65 (N·m)
45-50 (N·m)
70-75 (N·m)
80-85 (N·m)
Fig.16

Publicidad

loading