Descargar Imprimir esta página

Gree Serie Manual De Instalación página 11

Publicidad

Idiomas disponibles

Idiomas disponibles

DC Inverter U-match Series Floor Ceiling Type Unit
4.1.2 Preparation for Installing the Indoor Unit
(1). Open the air inlet grille and the screw cover, and remove the screws.
(2). Release the claws in the 3 places indicated.
(3). Release the center hook and remove the front panel.
(4). Release the claws in the 2 or 3 places indicated and remove the electric component cover.
4.1.3 Indoor Unit Installation
(1). Determine the location of the hanger through the paper template, and then remove the
paper template.
(2). Insert the anchor bolts into the drilled holes, and drive the pins completely into the anchor
bolts with a hammer.
(3). Remove the right and left side panels.
(4). Put the hanger bolt into the clasp of the indoor unit and tighten screws on the hanger to
prevent the indoor unit from moving.
(5). Reinstall and tighten the right and left side panels.
Floor type
Left side panel
Copyright 2018. This translation is property of GREE PRODUCTS SL. All rights reserved. Total or partial reproduction without its express authorization is prohibited.
Anchor bolt
Fig.5
Wall
Fig.6
9
Right side panel

Publicidad

loading