Descargar Imprimir esta página

Gree Serie Manual De Instalación página 12

Publicidad

Idiomas disponibles

Idiomas disponibles

Ceiling type
Left side panel
(6). Adjust the height of the unit to make the drain pipe slant slightly downward so that the
drainage will become much smoother.
4.1.4 Leveling
The water level test must be done after installing the indoor unit to make the unit is horizontal,
as shown below.
4.2 Installation of the Outdoor Unit
① . Install the unit where it will not be tilted by more than 5°.
② . During installation, if the outdoor unit has to be exposed to strong wind, it must be fixed securely.
Copyright 2018. This translation is property of GREE PRODUCTS SL. All rights reserved. Total or partial reproduction without its express authorization is prohibited.
DC Inverter U-match Series Floor Ceiling Type Unit
Ceiling
Suspension
bolt
Nut
Spring
washer
Fig.7
Horizontal tester
Fig.8
WARNING
10
Nut
Right side
panel
Hanger

Publicidad

loading