Booting The N20Xx Switch - Dell N20 Serie Guía De Introducción

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 274
4 If you are using a redundant or external DC power supply, such as the Dell
Networking RPS720 or Dell Networking MPS1000, connect the DC power
cable to the DC receptacle located on the back panel. In Figure 1-11 on
page 23, the redundant power supply feed is in the middle and is labeled
RPS.
Figure 1-11. AC and DC Power Connection to an N2048 Switch

Booting the N20xx Switch

When the power is turned on with the local terminal already connected, the
switch goes through a power-on self-test (POST). POST runs every time the
switch is initialized and checks hardware components to determine if the
switch is fully operational before completely booting. If POST detects a
critical problem, the program flow stops. If POST passes successfully, valid
firmware is loaded into RAM. POST messages are displayed on the terminal
and indicate test success or failure. The boot process runs for approximately
60 seconds.
You can invoke the Boot menu after the first part of the POST is completed.
From the Boot menu, you can perform configuration tasks such as resetting
the system to factory defaults, activating the backup image, or recovering a
password. For more information about the Boot menu functions, see the CLI
Reference Guide.
To DC Power Source (Optional)
Getting Started Guide
To AC Power Source
23

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

N30 serie

Tabla de contenido