Descargar Imprimir esta página

Mi-T-M Corporation CBA-4004-1MCH Manual Del Usuario página 13

Publicidad

Idiomas disponibles

Idiomas disponibles

INSTALLATION & PREPARATION
PRE-START INSPECTION PROCEDURES:
Before starting the unit, perform the following procedures:
1. Check the oil level in the pump and engine.
2. Inspect the water inlet strainer. Clean or replace if necessary. See "Water
Supply", #2, pg. 12.
3. Check all hose connections to ensure they are securely tightened. See "Water
Supply", #3, pg. 12.
4. Inspect for system fuel leaks. If a fuel leak is found, DO NOT START UNIT! See
"Fire & Ventilation Precautions", #2 and #4, pg. 4. Be sure that all damaged
parts are replaced and that the mechanical problems are corrected prior to
operation of the unit. If you require service, contact Customer Service.
5. Inspect high pressure hoses for kinking, cuts and leaks. If a cut or leak
is found, DO NOT USE HOSE! Replace hose before starting unit. See
"Miscellaneous Safety Precautions" #6, pg. 6. Be sure that all damaged
parts are replaced and that the mechanical problems are corrected prior to
operation of the unit. If you require service, contact Customer Service.
THE FOLLOWING PAGES CONTAIN OPERATING AND MAINTENANCE INSTRUCTIONS.
DO NOT ATTEMPT TO OPERATE THIS PRESSUREWASHER UNTIL YOU HAVE READ AND
UNDERSTOOD ALL SAFETY PRECAUTIONS AND INSTRUCTIONS LISTED IN THIS MANUAL.
INCORRECT OPERATION OF THIS UNIT CAN CAUSE SERIOUS INJURY!!
DO NOT ALTER OR MODIFY THIS EQUIPMENT IN ANY MANNER!
Operator's Manual
WARNING
13

Publicidad

loading