Preliminary Operations - Jacuzzi Young Collection Project Manual De Instalación

Ocultar thumbs Ver también para Young Collection Project:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

PLEASE READ THE INSTRUCTIONS CAREFULLY BEFORE
INSTALLING
Important
Please ensure that you thoroughly check the product upon receipt
since we cannot accept responsibility for any damage reported af-
ter installation. Should you find any damage, please immediate-
ly notify the forwarder.
WE RECOMMEND CHECKING THAT ALL THE ARRANGE-
MENTS COMPLY WITH THE INSTRUCTIONS FOR PRE-
INSTALLATION.
I Unpack the bath and lift it only by the rim and never by any pipe
line or electric equipment (use protective gloves).
I Check for any damage or defects by removing the pro-
tective plastic film (damages from impact or scratches re-
ported after installation are not covered by our guarantee).
I Check that the clamps holding the rubber couplings
and the air lines are tightly fastened.
I The installation of the whirlpool baths can be made against fin-
ished (tiled) walls and floor.
The panels allow access to electromechanical devices in-
stalled under the bath rim, as well as proper aeration re-
quired for water-air mixture during hydromassage.
Aeration must be guaranteed also if Jacuzzi
not used (see "Instruction for pre-installation"). Panels
must be firmly installed and proper tools must be used
when being removed. Openings, holes, grids, used for
aeration, should not allow the introduction of objects
having a diameter of 12 mm or larger.

PRELIMINARY OPERATIONS

i
I (
1 ) Place the tub in its location of installation. Level it and
adjust the height by manually turning the feet (A) located on
i
the corners of the tub (
The upper level of the tub, measured at the end of the
NOTE:
edge, must be at a height of 60 cm from the floor. To com-
pensate for possible irregularities of the floor, the bath feet
can be regulated from -0,5 + 1 cm
DO NOT TOUCH BLOCKING NUTS (G) MARKED WITH A
RED ARROW STICKER (
i
I (
2 ) Mark on the floor a hole for each outer foot. One hole
is enough.
Remove the bath and drill the floor.
Insert screw anchors (B). Adjust center feet (A1) so they rest
i
firmly on the floor (
If the tub calls for installation of Jacuzzi
the edge of the bath, install them (
is positioned and secured in its location of installation.
®
1 ).
i
2 ).
1 ).
®
tap fixtures on
i
5 ) before the tub
i
I (
3 or 4, depending on the model ) At this stage, assem-
ble the drain column and connect it with a siphon, preferably a
plastic one.
If filling of the tub takes place via the column (dis-
pensed form overflow) you will need to install a specif-
ic DB-type protection unit (standard EN 1717), located
at least 15 cm above the edge of the tub. Concerning
system methods, we recommend you contact your wa-
ter company and/or your plumber.
I Before fixing the bath to the floor, a final test for possible wa-
ter leaks caused by transport damage should be made. Fill the
bath up to approx. 5-6 cm. above the uppermost hydromas-
sage jets.
Please make sure that all joints and fittings are thoroughly in-
spected, before emptying the tub.
i
I (
2 ) Drain the bath and secure all outer feet with screws
(C) to the floor.
i
(
1 ) Adjust center feet (A1) so they rest firmly on the floor.
I Connect the electrical box to the network and earth
system, following the electrical diagram and the direc-
tives contained in the chapter "Electrical Safety".
ASSEMBLING THE TAPS AND FITTINGS
(if included)
i
(
5
)
ATTENTION: the position of the water outlet varies
depending on the type of tub.
I Take the box that holds the various components of the taps
panels are
and fittings.
NOTE: assembly of the taps and fittings must be done
with the tub outside of the place of installation and be-
fore it is fastened to the floor.
i
I
(
) (1) Unscrew the headless screw. Slide out the cylin-
6
der of the tub filler (2); (3) then tighten ring nut "A" and ring
nut "B", and finally install the gasket "C".
NOTE: keep the headless screw.
i
I
(
7)
dicated hole and tighten the coupling from above with the o-rings.
i
I
(
) (1) By means of the coupling and the ring nut (2), tem-
8
porarily fasten the cylinder, ensuring that it is parallel with the
tub edge (3).
i
I
(
) Install on a tap the same units used for the cross
9
cylinder. Repeat the operation for the other tap.
i
I
(
10
dicated holes and tighten from above the ring nuts with the
o-rings
i
I
(
11
) By means of the respective ring nuts temporarily fas-
ten the taps, turning one with respect to the other, so as to
make it easier to install the flexible hoses (3).
i
I
(
12
from above using the ring nuts (2).
7
F rom under the tub edge, insert the cylinder in the in-
) From under the tub edge, insert the taps in the in-
) (1) Install the covers as shown, and fasten them

Publicidad

Tabla de contenido
loading

Tabla de contenido